This one is a work in progress. I still have to changed the sloped end on the other side of the existing culvert and do cleanup. This was work performed on my entrance, and my wife was happy with it, so it must be good work, right? This part of the project took 2 loads of road base, 2 loads of fill dirt, a 20′ culvert, and 2 precast sloped ends for the culvert. The state requires that culverts have safety end treatments, and that the treatments match the existing treatments along the road. That means that if the other entrances have concrete ends, then the work we perform must also have the concrete ends.

More pictures to follow as I get more time to finish up the work!